Code compliant. Documented. Done right.
Commercial door hardware for municipal buildings, courthouses, libraries, and public facilities across Central New York — where the hardware has to survive public traffic and the paperwork has to survive public records.
What This Covers
Grade 1 or Nothing
Public buildings see uncontrolled traffic by people with no stake in the hardware. Grade 2 in a public entrance is a false economy measured in months. Specification here starts at Grade 1 and anything less needs a reason.
ADA Compliance and Remediation
Public buildings carry the highest accessibility expectations and the most scrutiny. Opening force, closer timing, hardware height, and operability measured across the building, with a remediation list ordered by what actually blocks access.
NFPA 80 Inspection and Records
Annual inspection, performed and documented per opening in a form that goes into the public record and answers a question rather than raising one.
Procurement Ready
W-9 and certificate of insurance available on request, references available, and comfortable working within municipal purchasing and documentation requirements.
Public buildings are judged on the records, not the intent.
Whatever was done to an opening, what gets produced later is the documentation. Work that can't be documented doesn't help when the question is asked.
Symptoms Worth a Second Look
- Residential-grade hardware in a public entrance
- Accessibility complaints about specific doors
- No fire door inspection records in the building file
- Hardware replaced repeatedly on the same high-traffic openings
- Keying with no current record of who holds what
- Exterior entrances that have never been adjusted for winter
Questions About Government & Municipal
- Why Grade 1 hardware for public buildings?
Public buildings take heavy, unpredictable traffic and have to last between capital budgets. Grade 1 hardware is tested for exactly that duty.
- Can you provide documentation for a capital plan?
Yes. A condition report per opening shows what's serviceable, what's near end of life, and what's out of compliance.
- Do you work with municipal procurement?
Yes — vendor registration, W-9, and references.
Related
Compliance Documentation
The records these buildings are asked for.
Maintenance Plans
Scheduled visits rather than reactive calls.
NFPA 80 Fire Door Requirements
The annual inspection requirement.
ADA Door Hardware Requirements
Opening force, height, and closer timing.
Schools & Educational Facilities
Similar public-sector requirements.
Healthcare & Medical Facilities
Institutional compliance work.
Need a building surveyed?
Tell me the building and what has prompted the question — an inspection, a complaint, or capital planning. A free 15-minute phone consult is often enough to tell what you're dealing with. For a full assessment, the door, frame, and hardware are looked at together, with the findings in writing.